During an earthquake, stay cables may experience significant gain or loss in tension. We need to perform a time-history analysis of the bridge to quantify the axial tension in the cables during a seismic event. However, these final cable forces obtained from time-history analysis depend on the permanent state of the bridge, i.e., when it is subjected to dead loads plus cable pretension.
In MIDAS CIVIL NX, for time-history analysis, cables are modeled as equivalent truss elements, which is valid as long as the cables remain in tension. This article walks through the workflow for performing THA on a completed stage cable-stayed bridge model and compares five approaches for applying the permanent state prior to the earthquake.
The example uses the MIDAS CIVIL NX tutorial model
"C:/Program Files/MIDAS/MIDAS CIVIL NX/Tutorial/10 Cable Stayed Forward Construction.mcb".
Save the model in a different folder before you start.
Convert the last construction stage, "Stage 13", of the forward analysis model into a static analysis model. Open the file "10 Cable Stayed Forward Construction_Stage13.mcb" and save it as Model 1.mcb.
Figure 1. File > Save Current Stage As
Create the load combination CB: LC from the load cases active in the final stage, then define the static load case ST: D+P from it for permanent loads and pretension.
Figure 2. Load combination CB: LC with the active load cases in the final stage
Figure 3. Load > Static Loads > Using Load Combinations
In Analysis > Main Control Data, convert the tension-only cable elements into equivalent truss elements.
Figure 4. Analysis > Main Control Data
Define a time history load case D+P with a very high modal damping of 0.999 to obtain quasi-static responses under permanent effects. This load case is the precursor to the seismic load case.
Figure 5. Load > Dynamic Loads > Load Cases > Add (TH: D+P)
Define a step function with a scale factor of 1 for a duration of 10 seconds or longer than the end time of the TH: D+P load case.
Figure 6. Load > Dynamic Loads > Time History Functions > Add Time Function
Assign ST: D+P as a time-varying static load to the TH: D+P load case using the step function.
Figure 7. Load > Dynamic Loads > Time Varying Static Loads
Define an earthquake time history load case TH: Seismic, with Rayleigh damping. Under Order in Sequential Loading, set it Subsequent to Load Case TH: D+P so it acts after the permanent effects are considered.
Check “Keep Final Step Loads Constant” to ensure the correct cable tension forces are obtained. When “Keep Final Step Loads Constant” is not considered, under the THmin: Seismic load case, a few cables incorrectly show compressive forces.
Figure 8. Load > Dynamic Loads > Load Cases > Add (TH: Seismic)
Define a normalized acceleration time-history function for the earthquake.
Figure 9. Load > Dynamic Loads > Time History Functions > Add Time Function > Earthquake
Assign the function, Elcent_v, as ground acceleration in the vertical direction for TH: Seismic, with a scale factor of 1 and an arrival time of 0 sec.
Figure 10. Load > Dynamic Loads > Ground Acceleration > Function for Direction Z > Add
You can check more of these details in the download file.