    Composite Steel Integral Bridges are quite popular for highway bridges spanning between 30m to 45m and with skew less than 30 degrees. Structural steelwork provides a lighter and quicker construction with adequate structural capacity. Integral bridges have the additional benefits of good ride quality, increased durability, and robust structural behavior.

     

    With all the benefits of integral bridges, there are design challenges especially when it comes to the interaction of the structure with geotechnics. This article will discuss an example of a composite steel integral bridge, covering the analysis and design concepts used for such bridges.

     


    Key Points

     

     

     

    Key Point 1: How to decide on the various bridge parameters

    The article discusses how the bridge geometry was decided, key construction parameters considered, and major determinants to selecting the foundation size and layout.

     

    Key Point 2: What are the key loads to be considered in Integral Bridge Design

    The webinar will discuss various scenarios of loading including the effect of thermal expansion and contraction in conjunction with earth pressure effects and different live load combinations acting on the bridge from the UK and Eurocode perspective.

     

    Key Point 3: Analysis and Design Considerations

    The webinar will discuss how to efficiently set up the analysis model to reflect a grillage deck, soil-structure interaction in the piles, and how to use the automated capacity calculation tools in MIDAS.

     


    What is an Integral Bridge?

     

    Conventional bridges have the superstructure supported on the substructure via bearings. The abutment behaves separately from the main bridge and there are expansion joints that separate the bridge from the approach road/embankment. Conventional bridges, therefore, allow for free movements of the deck under thermal expansion and contraction. In an integral bridge, however, there are no expansion joints to accommodate enlargement due to temperature variations and the bridge span is monolithic to the abutments. The following figures demonstrate the difference between a conventional bridge and an integral bridge.

     

     

    Integral Abutment Bridge vs Conventional BridgeIntegral abutment bridge vs. Conventional bridge
     
     

     

    Why Integral Bridge?

     

    Integral bridges are more durable than conventional bridges because of the continuity in the structure. There is no chance of leakage of salts through deck joints to abutments and piers. Integral bridges require lesser maintenance and fewer inspection problems. Integral bridges offer better structural performance, better Ride Quality, and better seismic performance. DMRB Standard CD350 states to go for integral bridge for spans<60m and skew<30 degrees.

     

    Chloride Salt spray for deicingChloride salt spray for deicing
     
    Typical Expansion Joint in decks and corrosion to bearing platesTypical expansion joint in decks and corrosion to bearing plates
     

     

    Types of Integral Bridges

     

    Integral bridges are of various types depending on the type of substructure supporting them. PD6694-1 shows that integral bridges resist the thermal contraction and expansion either through translation only or a combination of translation and rotation of the abutment. There are Frame type abutments that resist thermal movements using both rotation and translation of the abutment. There are bank pad abutments that are rigid and do not allow much rotation. In some cases, the earth (backfill) is separated from the substructure by using sleeves over piles or using reinforced earth walls.


    Types-of-Integral-bridges2Types of Integral Bridges

     

     

    Composite Action


    Composite steel bridge deck typically constitutes steel plate girders with a concrete deck slab behaving monolithically. The deck slab acts compositely with the steel girders with the help of shear stud connectors. The construction of such a bridge involves, the steel girders being simply supported and then concrete being poured on the formwork supported on the steel girders. The stresses due to dead loads of concrete and steel are locked into the steel section. Once the concrete hardens, the composite section will undergo stresses due to other superimposed dead loads, the live loads, thermal actions, etc.

     

     
     

     

    Stress build-up in Composite sectionsStress buildup in Composite sections (Source: SCI P356)

     

     

     

    Location of the Example Bridge

     

    The example bridge is proposed at a location where a major motorway is facing an at grade junction which has led to congestion problems in the area. Therefore, the bridge is proposed to separate the grade at the junction and the bridge will cross over the existing motorway. The location is as shown below.

      
    Left - Present condition at grade juntion; Right - proposed design grade separated juntion with main highway running below the bridge
    Left: Present condition - At grade junction (congestion problem); Right: Proposed design - Grade separated junction with main highway running below the bridge

     

     

     

    Structure Description


    The bridge is a single span 31m structure (c/c of abutments), fully integral deck and abutment; separate wing walls, 8Nos. steel-plated I girders spaced at ~2.8m c/c. The deck is 22m wide carrying a 10m wide carriageway with a 5.7 degrees skew, 250mm thick constructed cast in-situ. The substructure comprises 9m tall reinforced concrete abutments supported by 2x8=16 RCC piles.

     

    Elevation of the bridgeElevation of the bridge
     
     
     
    3D rendered model3D Rendered Model

     

     

     

    Deck cross-sectionDeck cross-section

     

     

    Sectional elevation showing wingwalls, abutments, pile caps, and pilesSectional Elevation showing wingwalls, abutments, pile caps, and piles
     
     
     
    Section at abutmentSection at abutment
     
     
     
     
     

    Dimensioning of Steelwork

     

    The first step of the design of the composite steel integral bridge is to dimension the steelwork. The dimensioning rules are derived from the Steel Construction Institute guidelines.

    Steel-Construction-Institue-guidelines

     

    components of a steel girderComponents of a steel girder
     
     
    Typical-permanent-formwork-(Permadec)
    Typical permanent formwork (Permadec)
     
    Steel section detail

    Steel section detail

     

     

    Dimensioning of Concrete Elements

     

    The next step of the design of the composite steel integral bridge is to dimension the concrete elements of the bridge including the deck slab, abutment, pile, and pile caps. The dimensioning rules are derived from the Steel Construction Institute guidelines and Eurocode detailing norms.

     

     

    Steel-Construction-Institute-guidelines-and-Eurocode-detailing-norms

     

     

    Parapet edge beam detailParapet edge beam detail

     

    Girder end detail at integral abutment (SCCIP356)Girder end detail at integral abutment (SCIP356)
     
     
    Typical RC Detail of Pile Cap (IStrucE GuidE)
    Typical RC detail of pile cap (IStructE guide)

     

     
     
     

    Backfilling

     

    Another important point to consider is the sequence of filling earth i.e. backfilling the back of the integral bridge abutment. When the backfilling is done just after constructing the abutment but before placing the beams, the earth pressure at rest will act on the cantilevering abutment wall leading to a bending moment and base shear. The increased bending moment at the base of the abutment will lead to a more significant pile foundation and an increase in the cost of the substructure. Whereas, backfilling the abutment after constructing the bridge deck i.e. integral abutment, the earth pressure at rest acts on the abutment that acts as a propped cantilever leading to a reduced bending moment on the abutment but will increase hogging moments and axial compression on the steel girders making the steelwork more expensive but making substructure lighter. Though the latter case seems more reasonable as an increase in steelwork weight usually is less expensive than an increase in the size of the pile foundation. However, in this case, the first case was selected due to contractor preference as it was preferred to lift the steelwork from the back of the abutment.

     

    Backfilling before installing girders (left), backfilling after integral connection (right)

     

    Approximate graphic showing intent of contractorApproximate graphic showing intent of contractor

     

     

    Global Structural Analysis

     

    To analyze the global structure, a 3 Dimensional grillage model has been developed in midas Civil. The longitudinal members of the deck represent the Composite section. 15% of the span has been assigned with cracked slab properties longitudinally. The Transverse members comprise rectangular concrete section properties. The Abutment is modeled using Grillage elements (with dummy shells for pressure loads). The Pile Cap is modeled as a stiff pile cap with rigid links and the Piles are modeled as line elements applied with soil springs.

     

    3D midas Civil model
     
    3D midas Civil model

     

    Modeling detail of pilecap and pile connection (left); composite girder section (righT)Modeling detail in midas Civil

     

     

    Dead Loads and Superimposed Dead Loads

     

    Dead load or self-weight applied in MIDAS using the self-weight functionality of MIDAS. Other Superimposed dead loads are applied with element beam loads and pressure loads.

     

    Dead loads and Superimposed dead loadsDead loads and superimposed dead loads in midas Civil
     
     
     

    Thermal Actions

     

    The integral bridge does not allow any free movement of the deck and therefore thermal expansion and contraction cause stresses in the superstructure and substructure. 2 kinds of temperature loads are applied. The uniform temperature is applied using Element Temperature functionality in midas Civil whereas the nonlinear temperature gradient is applied using beam section temperature.

     

    Thermal Loads (Uniform + Differentail) EurocodesThermal loads (Uniform + Differential), Eurocodes

     

    Differential temperature to EurocodesDifferential temperatures to Eurocodes
     
     
     Deformations under thermal expansion
    Deformations under thermal expansion
     
    Deformations under thermal contractionDeformations under thermal contraction
     
     
     
     

    Earth Pressure

     

     

    The earth pressure is calculated using the method given in PD6694-1. There are various scenarios of loading that have been considered. In the case of the thermal contraction, the deck contracts, and the earth pressure acting on the abutment is active earth pressure, Ka. When the deck expands due to the thermal expansion case, the earth pressure is calculated using the K* coefficient from the PD6694-1. The third case involves an asymmetric loading where there is a braking or traction load at one end of the bridge leading to active pressure at one abutment and the other abutment with at-rest pressure. Also, before the deck is constructed the backfilling is done at the back of the abutment, and in this condition, the earth pressure at rest Ko is applied. All earth pressure loads are applied using hydrostatic pressure loads in MIDAS.

     

    Earth-pressure-Diagram-from-PD6694Earth-pressure-applied-in-midas-(bottom).Earth pressure application for different loading scenarious

    Traffic Live Loading

     

    The traffic live load models are applied in accordance with the UK National Annex of BS EN1991-2 including Load Model 1, Load Model 2, footway pedestrian loading, Load Model 3 (SV100, SV19, and SOV250). The Moving Load Analysis feature in midas Civil has been used to perform influence line analysis and determine the most onerous vehicle load combination positions on the grillage model.

     

    SOV250
    SOV 250 Vehicle

     

    Live load combination (LM1+SOV250) in midas CivilLive load combination (LM1 + SOV250) in midas Civil
     
     
     

     

    Live Load Horizontal Surcharge

     

    Horizontal Earth Pressure is generated due to Live load surcharge from vehicle loads near the abutment and that is calculated as per PD6694-1. The Live load horizontal surcharge is applied as Plane loads on the plate elements in midas Civil or as element beam loads applied over dummy elements.

     

    Figure from PD6694Figure from PD6694
     

     

    Horizontal live load surcharge applied in midas CivilHorizontal live load surcharge applied in midas Civil
     
     
     
     

    Construction Stage Analysis

     

    The construction sequence analysis is important for this type of bridge because of the changing loads, boundary conditions, and section properties of the elements. The earth pressure at rest acts before the steel girders are in place. The steel girders will be placed as simply supported beams on the abutment which will later become integral with the abutment and the longitudinal section properties will become composite. The various stages of construction are shown below.

     

    Stage 1: 

    • Construct piles, pile caps, and abutments
    • Apply backfill

    Construction Stage 1

     

    Stage 2: 

    • Install steelwork on temporary bearings (simulated as beam end released in midas Civil)
    • Pour wet concrete on formwork supported on steelwork

    Construction Stage 2

    Stage 3: 

    • Concrete becomes composite
    • SDL and surfacing activated
    • Concrete long-term elastic modulus activated at later days

    Construction stage 3

    Composite Steel Design Checks

     

    Midas Civil was used to carry out the global longitudinal steel girder capacity checks to EN1994-2. The bending resistance, shear resistance, longitudinal shear connector, fatigue checks are carried out using the midas Civil.

     

    built-in eurocode and detailed calculation output midasBuilt-in Eurocode features and detailed calculation output from midas Civil
     
     
    Summary results table generated from midas CivilSummary results table generated from midas Civil
     
     

     

    Steel Buckling Checks

     

    During the temporary condition when the steel girders are simply supported and the concrete is poured over the formwork, the steelwork is susceptible to buckling. Also, the bracings are to be checked for impact loads. Both these checks require conducting a finite element analysis with shell (plate) elements.

     

     

    Finite Element Model with simply supported pair of girdersFinite Element Model with simply supported pair of girders
     
     
    Linear Buckling Analysis - Lateral torsional buckling modeLinear Buckling Analysis: Lateral torsional buckling mode
     
     
     

     

    Transverse Slab Analysis

     

    Transverse Reinforcement in the deck slab has been calculated using a local line beam model with a continuous beam approach with steel girders simulated as vertical supports. The global effects of dead loads in the slab is considered by taking differential deflections between 2 adjacent girders taken from the global grillage model.

     

    Line beam model for slabLine beam model for slab
     
     
    local bending effects under live loads
    Local bending effects under live loads
     
     
    Differential settlement between girdersDifferential Settlement between girders
     
     
     

    Reinforced Concrete Capacity Checks

     

    Reinforced concrete elements like abutments, wingwalls, piles, and pile caps are checked using simple spreadsheets as per Eurocode 2. The pile design has been done using an iterative process with geotechnics. The pile cap total loads are shared with the Geotech team to run a 2D nonlinear analysis in Geotech software to provide the structures team with soil springs which were rerun in midas civil to arrive at revised pile cap loads. The revised pile cap loads yield a new set of pile forces from Geotech. Pile Cap is designed as a strut and tie model as shown in the images below.

     

    Pile bending moments from midas GeotechPile bending moments from Geotech

     

    Pile cap idealisation (Concrete Centre Design Guide)Pile cap idealization (Concrete Centre Design Guide)

     

     

    MIDAS Expert Webinar Series Video

     

     

    Subscribe to Newsletter

    Catch the weekly engineer news!

    About the Author
    Abhishek Das | Structural Engineer | AECOM India

    Abhishek is a structural engineer with more than 9 years of extensive experience in the design and assessment of railway and highway bridges and special structures across multiple geographies.

     

     

    DOWNLOAD Download the
    Full Webinar Presentation

    Please fill out the form below
    to download the full webinar presentation

    All

    What you may
    also like

    Subscribe to Newsletter

    Catch the weekly engineer news!