Blog

The Latest Engineering Trends and Issues

Blog | Design of 20m Deep Excavation with Permanent Anchored SBPW and CBPW

Hyebin Cha2022.03.29

Deep excavation MIDAS GTS NX Retaining Structures

Design of 20m Deep Excavation with Permanent Anchored Secant Bored Pile Wall (SBPW) and Contiguous Bored Pile Wall (CBPW) as Retaining Structure of Cut and Cover Tunnel

 

Read More