Design of 20m Deep Excavation with Permanent Anchored Secant Bored Pile Wall (SBPW) and Contiguous Bored Pile Wall (CBPW) as Retaining Structure of Cut and Cover Tunnel
The Latest Engineering Trends and Issues
Deep excavation MIDAS GTS NX Retaining Structures