Blog

The Latest Engineering Trends and Issues

Blog | Design of 20m Deep Excavation with Permanent Anchored SBPW and CBPW

Hyebin Cha2022.03.29

Deep excavation MIDAS GTS NX Retaining Structures

Design of 20m Deep Excavation with Permanent Anchored Secant Bored Pile Wall (SBPW) and Contiguous Bored Pile Wall (CBPW) as Retaining Structure of Cut and Cover Tunnel

 

Read More

Blog | Modelling of the joints between segments in TBM tunnel (Part 1)

Hyebin Cha2021.07.06

#TBM MIDAS GTS NX Nonlinear Analysis Finite Element Modeling #Longitudinal Joints #Concrete Lining

For a correct modeling of the joints between segments in a TBM tunnel


1. (Part 1) Introduction

2. (Part 1)Joints within the same rings (longitudinal joints)

3. (Part 2) Non-linear analysis

4. (Part 2) Conclusion

 

Click here to see the on-demand webinar 

CTA_KEYWORD_TBM

 


Read More