Would you like to sign out?

Select Country

  • Afghanistan English
  • Albania English
  • Algeria English
  • American Samoa English
  • Andorra English
  • Angola English
  • Anguilla English
  • Antarctica English
  • Antigua and Barbuda English
  • Argentina Español
  • Armenia English
  • Aruba English
  • Australia English
  • Austria English
  • Azerbaijan English
  • Bahamas English
  • Bahrain English
  • Bangladesh English
  • Barbados English
  • Belarus English
  • Belgium English
  • Belize English
  • Benin English
  • Bermuda English
  • Bhutan English
  • Bolivia Español
  • Bosnia and Herzegovina English
  • Botswana English
  • Bouvet Island English
  • Brazil English
  • British Indian Ocean Territory English
  • British Virgin Islands English
  • Brunei English
  • Bulgaria English
  • Burkina Faso English
  • Burundi English
  • Cambodia English
  • Cameroon English
  • Canada English
  • Cape Verde English
  • Caribbean Netherlands English
  • Cayman Islands English
  • Central African Republic English
  • Chad English
  • Chile Español
  • Christmas Island English
  • Cocos (Keeling) Islands English
  • Colombia Español
  • Comoros English
  • Congo English
  • Cook Islands English
  • Costa Rica Español
  • Côte d’Ivoire English
  • Croatia English
  • Cuba Español
  • Curaçao English
  • Cyprus English
  • Czech Republic English
  • Democratic Republic of the Congo English
  • Denmark English
  • Djibouti English
  • Dominica English
  • Dominican Republic Español
  • Ecuador Español
  • Egypt English
  • El Salvador Español
  • Equatorial Guinea English
  • Eritrea English
  • Estonia English
  • Ethiopia English
  • Falkland Islands English
  • Faroe Islands English
  • Fiji English
  • Finland English
  • France English
  • French Guiana Español
  • French Polynesia English
  • French Southern Territories English
  • Gabon English
  • Gambia English
  • Georgia English
  • Germany English
  • Ghana English
  • Gibraltar English
  • Greece English
  • Greenland English
  • Grenada English
  • Guadeloupe Español
  • Guam English
  • Guatemala Español
  • Guernsey English
  • Guinea English
  • Guinea-Bissau English
  • Guyana English
  • Haiti Español
  • Heard Island and McDonald Islands English
  • Honduras Español
  • Hong Kong English
  • Hungary English
  • Iceland English
  • India English
  • Indonesia English
  • Iran English
  • Iraq English
  • Ireland English
  • Isle of Man English
  • Israel English
  • Italy English
  • Jamaica English
  • Japan 日本語
  • Jersey English
  • Jordan English
  • Kazakhstan English
  • Kenya English
  • Kiribati English
  • South Korea 한국어
  • Kuwait English
  • Kyrgyzstan English
  • Laos English
  • Latvia English
  • Lebanon English
  • Lesotho English
  • Liberia English
  • Libya English
  • Liechtenstein English
  • Lithuania English
  • Luxembourg English
  • Macau English
  • Madagascar English
  • Malawi English
  • Malaysia English
  • Maldives English
  • Mali English
  • Malta English
  • Marshall Islands English
  • Martinique English
  • Mauritania English
  • Mauritius English
  • Mayotte English
  • Mexico Español
  • Micronesia English
  • Moldova English
  • Monaco English
  • Mongolia English
  • Montenegro English
  • Montserrat English
  • Morocco English
  • Mozambique English
  • Myanmar English
  • Namibia English
  • Nauru English
  • Nepal English
  • Netherlands English
  • New Caledonia English
  • New Zealand English
  • Nicaragua Español
  • Niger English
  • Nigeria English
  • Niue English
  • Norfolk Island English
  • Northern Mariana Islands English
  • Norway English
  • Oman English
  • Pakistan English
  • Palau English
  • Palestine English
  • Panama Español
  • Papua New Guinea English
  • Paraguay Español
  • Peru Español
  • Philippines English
  • Pitcairn Islands English
  • Poland English
  • Portugal Español
  • Puerto Rico Español
  • Qatar English
  • Réunion English
  • Romania English
  • Russia English
  • Rwanda English
  • Saint Barthélemy Español
  • Saint Helena English
  • Saint Kitts and Nevis English
  • Saint Lucia English
  • Saint Martin Español
  • Saint Pierre and Miquelon English
  • Saint Vincent and the Grenadines English
  • Samoa English
  • San Marino English
  • São Tomé and Príncipe English
  • Saudi Arabia English
  • Senegal English
  • Serbia English
  • Seychelles English
  • Sierra Leone English
  • Singapore English
  • Sint Maarten English
  • Slovakia English
  • Slovenia English
  • Solomon Islands English
  • Somalia English
  • South Africa English
  • South Georgia English
  • South Sudan English
  • Spain English
  • Sri Lanka English
  • Sudan English
  • Suriname English
  • Svalbard and Jan Mayen English
  • Eswatini English
  • Sweden English
  • Switzerland English
  • Syria English
  • Taiwan English
  • Tajikistan English
  • Tanzania English
  • Thailand English
  • Togo English
  • Tokelau English
  • Tonga English
  • Trinidad and Tobago English
  • Tunisia English
  • Turkey English
  • Turkmenistan English
  • Turks and Caicos Islands English
  • Tuvalu English
  • U.S. Virgin Islands English
  • Uganda English
  • Ukraine English
  • United Arab Emirates English
  • United Kingdom English
  • United States English
  • U.S. Minor Outlying Islands English
  • Uruguay Español
  • Uzbekistan English
  • Vanuatu English
  • Vatican City English
  • Venezuela Español
  • Vietnam English
  • Wallis and Futuna English
  • Western Sahara English
  • Yemen English
  • Zambia English
  • Zimbabwe English
  • Åland Islands English
  • East Timor English
  • Netherlands Antilles English
  • Serbia and Montenegro English
  • North Macedonia English
  • Timor-Leste English

Project Tutorial Wind Loads ASCE 7-16 wind pressures

Wind Load as per ASCE 7-16 for the Warehouse with Gable Hip Roof (Two Way)

Yeong-il SeoJune 20, 2022

Wind Load as per ASCE 7-16

 

Information of Example Model

This is an explanation how to input wind load data in the warehouse with gable hip roof(Two-way).

Information of the example model is given as follows.

Figure1. Warehouse Example Model

 
 
 Figure 2. Warehouse Roof Example Model
 
 
Table 1. Wind Load Data Informations
 
 
 
 
 
√ Table of Contents 
 
 
 
 
 
 
 

Project Tutorial Wind Loads ASCE 7-16 wind pressures

Wind Load as per ASCE 7-16 for the Warehouse with Gable Hip Roof

Yeong-il SeoJune 13, 2022

Wind Load as per ASCE 7-16

 

Information of Example Model

This is an explanation how to input wind load data in the warehouse with gable hip roof.

Information of the example model is given as follows.

Figure1. Warehouse Example Model

 
 
 Figure 2. Warehouse Roof Example Model
 
 
Table 1. Wind Load Data Informations
 
 
 
 
 
√ Table of Contents 
 
 
 
 
 
 
 

Project Tutorial Design Codes Reinforced Concrete Deflection ACI MIDAS nGEN moment redistribution Flexural Resistance continuous beam

How is Moment Redistribution Coefficient Calculated?

Yeong-il SeoApril 19, 2022

Moment Redistribution Coefficient

 

Project Tutorial Deflection MIDAS GEN Steel Beam continuous beam Beam Deflection cantilever beam deflection limit

Deflection Check of Steel Beam

Yeong-il SeoApril 11, 2022

What is it? - Deflection Limitation

 

The beam deflection is one of the checks that should be performed for serviceability limit state design. Deflection is the displacement within a structural member under the influence of loads, ignoring the displacements of the rest of the structure.

 


Figure 1. Deflection Limitation
 
 
 
 
Figure 2. Suggested Deflection Limits for Structural Elements
 
 
 
 
 
 

Project Tutorial Wind Loads ASCE 7-16 wind pressures

Wind Load as per ASCE 7-16 for the Warehouse with Monoslope Roof

Yeong-il SeoMarch 31, 2022

Wind Load as per ASCE 7-16

 

Information of Example Model

This is an explanation how to input wind load data in the warehouse with monoslope roof.

Information of the example model is given as follows.

Figure1. Warehouse Example Model

 
 
 Figure 2. Warehouse Roof Example Model
 
 
Table 1. Wind Load Data Informations
 
 
 
 
 
√ Table of Contents 
 
 
 
 
 
 
 

Project Tutorial Analysis Manual for Midas/Gen Design Conditions

Solution for Unknown Loads Using Optimization Technique

Yeong-il SeoFebruary 14, 2022

Solution for Unknown Loads Using Optimization Technique

 

Project Tutorial Construction Stage Analysis Time Dependent Material Properties Creep and Shrinkage Analysis Manual for Midas/Gen

Construction Stage Analysis Reflecting Erection Sequence

Yeong-il SeoJanuary 20, 2022

OVERVIEW

 

A building structure is typically constructed floor by floor in the case of a reinforced concrete structure or often constructed several floors at a time in the case of a structural steel structure. Even on the same floor, different parts are constructed at different stages.

A typical structural analysis entails applying the loads to the completed structure at once. This results in significant discrepancies as the scale of the building increase, especially as the number of stories increases. Regardless of the type of construction, construction dead loads on a particular floor are typically acting on the structure without the presence of the upper floors during the construction. This actually results in completely different column shortenings from the analysis results based on the “full loading on the completed structure”.  The change of strength gain, creep and shrinkage in the case of reinforced concrete construction compound the discrepancies. MIDAS/Gen enables the engineer to account for the change of geometries and time-dependent material properties during and after the construction.

Each temporary structure at a particular stage of construction affects the subsequent stages. Also, it is not uncommon to install and dismantle temporary supports during construction. The structure constantly changes or evolves as the construction progresses with varying material properties such as modulus of elasticity and compressive strength due to different maturities among contiguous members. The structural behaviors such as deflections and stress re-distribution continue to change during and after the construction due to varying time-dependent properties.

Since the structural configuration continuously changes with different loadings and support conditions, and each construction stage affects the subsequent stages, the design of certain structural components may be even governed during the construction. Without such construction stage analysis, the conventional analysis will not be reliable.

 

 

Contents

 

 

 

Project Tutorial Tips & Tutorials Structural Design Cable Elements Tension-Only Elements Truss Elements Nonlinear Elements Compression-Only Elements

Design Method of Structures Using Cable and Truss Elements

Yeong-il SeoDecember 23, 2021

OVERVIEW

Project Tutorial Structure Insight High-rise building Low-rise building Construction Stage Analysis Structural Design Column Shortening

Applications of Construction Stage Analysis in Structural Design

Yeong-il SeoDecember 16, 2021

Construction Stage Analysis at Low or Middle Building

 

Project Tutorial FEM Analysis MIDAS nGEN design criteria

Target Ratio

Yeong-il SeoOctober 7, 2021

Objective

Project Tutorial BIM MIDAS nGEN MIDAS GEN

Gen-nGen Interface

Yeong-il SeoSeptember 28, 2021

OVERVIEW

Project Tutorial Building Information Modeling BIM Revit Structure revit interface revit link

nGen Link for Revit Structure

Yeong-il SeoJuly 27, 2021

OVERVIEW

Project Tutorial Building Information Modeling BIM idea interface idea connection

Gen-IDEA Interface

Yeong-il SeoJuly 20, 2021

OVERVIEW

Project Tutorial structural drawings Foundation Drawing Member List Quantity takeoff Beam Schedule Rebar arrangement Bill of Materials

Auto-Generation of Structural Drawings

Yeong-il SeoJuly 6, 2021

OVERVIEW