Would you like to sign out?

Select Country

  • Afghanistan English
  • Albania English
  • Algeria English
  • American Samoa English
  • Andorra English
  • Angola English
  • Anguilla English
  • Antarctica English
  • Antigua and Barbuda English
  • Argentina Español
  • Armenia English
  • Aruba English
  • Australia English
  • Austria English
  • Azerbaijan English
  • Bahamas English
  • Bahrain English
  • Bangladesh English
  • Barbados English
  • Belarus English
  • Belgium English
  • Belize English
  • Benin English
  • Bermuda English
  • Bhutan English
  • Bolivia Español
  • Bosnia and Herzegovina English
  • Botswana English
  • Bouvet Island English
  • Brazil English
  • British Indian Ocean Territory English
  • British Virgin Islands English
  • Brunei English
  • Bulgaria English
  • Burkina Faso English
  • Burundi English
  • Cambodia English
  • Cameroon English
  • Canada English
  • Cape Verde English
  • Caribbean Netherlands English
  • Cayman Islands English
  • Central African Republic English
  • Chad English
  • Chile Español
  • Christmas Island English
  • Cocos (Keeling) Islands English
  • Colombia Español
  • Comoros English
  • Congo English
  • Cook Islands English
  • Costa Rica Español
  • Côte d’Ivoire English
  • Croatia English
  • Cuba Español
  • Curaçao English
  • Cyprus English
  • Czech Republic English
  • Democratic Republic of the Congo English
  • Denmark English
  • Djibouti English
  • Dominica English
  • Dominican Republic Español
  • Ecuador Español
  • Egypt English
  • El Salvador Español
  • Equatorial Guinea English
  • Eritrea English
  • Estonia English
  • Ethiopia English
  • Falkland Islands English
  • Faroe Islands English
  • Fiji English
  • Finland English
  • France English
  • French Guiana Español
  • French Polynesia English
  • French Southern Territories English
  • Gabon English
  • Gambia English
  • Georgia English
  • Germany English
  • Ghana English
  • Gibraltar English
  • Greece English
  • Greenland English
  • Grenada English
  • Guadeloupe Español
  • Guam English
  • Guatemala Español
  • Guernsey English
  • Guinea English
  • Guinea-Bissau English
  • Guyana English
  • Haiti Español
  • Heard Island and McDonald Islands English
  • Honduras Español
  • Hong Kong English
  • Hungary English
  • Iceland English
  • India English
  • Indonesia English
  • Iran English
  • Iraq English
  • Ireland English
  • Isle of Man English
  • Israel English
  • Italy English
  • Jamaica English
  • Japan 日本語
  • Jersey English
  • Jordan English
  • Kazakhstan English
  • Kenya English
  • Kiribati English
  • South Korea 한국어
  • Kuwait English
  • Kyrgyzstan English
  • Laos English
  • Latvia English
  • Lebanon English
  • Lesotho English
  • Liberia English
  • Libya English
  • Liechtenstein English
  • Lithuania English
  • Luxembourg English
  • Macau English
  • Madagascar English
  • Malawi English
  • Malaysia English
  • Maldives English
  • Mali English
  • Malta English
  • Marshall Islands English
  • Martinique English
  • Mauritania English
  • Mauritius English
  • Mayotte English
  • Mexico Español
  • Micronesia English
  • Moldova English
  • Monaco English
  • Mongolia English
  • Montenegro English
  • Montserrat English
  • Morocco English
  • Mozambique English
  • Myanmar English
  • Namibia English
  • Nauru English
  • Nepal English
  • Netherlands English
  • New Caledonia English
  • New Zealand English
  • Nicaragua Español
  • Niger English
  • Nigeria English
  • Niue English
  • Norfolk Island English
  • Northern Mariana Islands English
  • Norway English
  • Oman English
  • Pakistan English
  • Palau English
  • Palestine English
  • Panama Español
  • Papua New Guinea English
  • Paraguay Español
  • Peru Español
  • Philippines English
  • Pitcairn Islands English
  • Poland English
  • Portugal Español
  • Puerto Rico Español
  • Qatar English
  • Réunion English
  • Romania English
  • Russia English
  • Rwanda English
  • Saint Barthélemy Español
  • Saint Helena English
  • Saint Kitts and Nevis English
  • Saint Lucia English
  • Saint Martin Español
  • Saint Pierre and Miquelon English
  • Saint Vincent and the Grenadines English
  • Samoa English
  • San Marino English
  • São Tomé and Príncipe English
  • Saudi Arabia English
  • Senegal English
  • Serbia English
  • Seychelles English
  • Sierra Leone English
  • Singapore English
  • Sint Maarten English
  • Slovakia English
  • Slovenia English
  • Solomon Islands English
  • Somalia English
  • South Africa English
  • South Georgia English
  • South Sudan English
  • Spain English
  • Sri Lanka English
  • Sudan English
  • Suriname English
  • Svalbard and Jan Mayen English
  • Eswatini English
  • Sweden English
  • Switzerland English
  • Syria English
  • Taiwan English
  • Tajikistan English
  • Tanzania English
  • Thailand English
  • Togo English
  • Tokelau English
  • Tonga English
  • Trinidad and Tobago English
  • Tunisia English
  • Turkey English
  • Turkmenistan English
  • Turks and Caicos Islands English
  • Tuvalu English
  • U.S. Virgin Islands English
  • Uganda English
  • Ukraine English
  • United Arab Emirates English
  • United Kingdom English
  • United States English
  • U.S. Minor Outlying Islands English
  • Uruguay Español
  • Uzbekistan English
  • Vanuatu English
  • Vatican City English
  • Venezuela Español
  • Vietnam English
  • Wallis and Futuna English
  • Western Sahara English
  • Yemen English
  • Zambia English
  • Zimbabwe English
  • Åland Islands English
  • East Timor English
  • Netherlands Antilles English
  • Serbia and Montenegro English
  • North Macedonia English
  • Timor-Leste English

Spine and Wing Construction

February 4, 2022
BLOG NEWS & TRENDS

Spine and Wind Construction

 

Table of Contents

 

1. Introduction

2. Structural Elements of Spine and Wing

3. Modeling

  1. Single Line Longitudinal Modeling

  2. Transverse Modeling

 

4. Conclusion

 


1. Introduction

 

In modern-day cities, the availability of space for carrying out construction activities as well as sparing space for infrastructure is becoming difficult day by day. There is a growing demand for more urban space and innovative transportation planning and development to meet that demand. Often, there is a restriction of the available width. The current trend in urban areas is to go for elevated roads which can avoid costly land acquisition, decrease traffic congestion and improve the speed of movement. However; the construction of long elevated corridors has a few challenges of its own. Usually, they require twin/multiple piers, covering a major part of the space underneath the superstructure. With the use of pre-casting and segmental technology for fast-track solutions, the trend is now shifting to the provision of only a single median pier to cover the entire deck, which also renders the space underneath the deck to be used for traffic movement as well. One such technology is the spine and wing construction technology.

 

fig 1

Figure 1. Spine and wind construction
 
 
 

 


2. Structural Elements of Spine and Wing

 
 

 

Spine and wing basically contain 3 components: single/multicell box girder over the pier, wide central spine, and 2 equal wings hanging from either end of the box girder. Furthermore, these are generally accompanied by rib construction which connects the central spine with the wing. Generally, the central spine and wings are pre-casted separately. These pre-casted segments are stitched together with the help of transverse prestressing. So, all in all, spine and wing bridges are accompanied by both longitudinal as well as transverse prestressing.

 

fig 2Figure 2. General configuration of spine and wing bridges

 

 

This type of nonlinearity does not require a combination of stabilizing and destabilizing loads for the analysis, but other considerations like time step size and concrete age take importance.

 

General Construction Process

 

Firstly, precast spine segments are launched and stitched together to each other using epoxy and temporary prestressing. Once all the segments are placed, permanent longitudinal prestressing is done and they are placed over the bearing. Subsequentially, cantilevered wings are stitched transversely to the spine along with ribs. This stitching is accompanied by transverse prestressing. This completes the general construction of the superstructure.

 

 


3. Modeling

 

Generally, three types of modeling methodologies can be adopted for numerical modeling and analysis of bridges. A) Longitudinal Modeling B) Transverse Modeling.

 

A) Single Line Longitudinal Modeling

 

In single-line longitudinal modeling, the properties of the entire cross-section are defined for the elements and Line Modelling is used to generate the geometry of the bridge.

 

fig 3Figure 3. Line model

 

 

fig 4Figure 3. Line model

 

The major benefit is that analysis is very quick and longitudinal design could be performed with this model. It should be noted that in such a type of modeling, we cannot get any results in the transverse direction from the analysis in the global system. Only the longitudinal results like the bending moment, shear force, torsion, stress variation, etc. along the longitudinal direction can be obtained.

 

B) Transverse Modeling

 

In a transverse model, the cross-section is subdivided into smaller elements and the transverse behavior for the required location can be modeled and analyzed.  For wide structures like this, it is recommended to model at least 1 span. It is generally advised to create both types of models to get a complete understanding of the structural behavior.

 

fig 5Figure 5. Transverse Model
 
 

 

Now with this background about the modeling methodologies, we shall now discuss the modeling of a Spine and Wing Construction Method.

 

For modelling Spine and Wing type bridges, the longitudinal and transverse modelling methodology is used in this article. The cross-section can be modelled as a composite section with Spine being Part-1 and the Wings as Part-2. This type of section can be defined using Section Property Calculator in midas.

 

fig 6

Figure 6. Composite section definition
 
 

The Construction sequence of the bridge is as discussed below.

 

  • Stage 1: Erection of substructure

fig 7

Figure 7. Substructure layout 
 
 
 
  • Stage 2: Precast Spine segment erection with overhead Launching Girders and Suspenders

     

In the first stage, the precast spine segments are erected with the help of Launching Girders; then Spine Beams are placed on the Temporary Bearings, and initial longitudinal Prestressing is applied.

 

fig 8a

 
 

 

fig 8b

Figure 8. Construction stage 2
 
 
 
  • Stage 3: Launching Assembly

The launching assembly loads are now applied to the spine sections.

 

fig 9

Figure 9. Construction stage 3
 
 
  • Stage 4: Wings Lifting

The Precast Cantilever Wings are now lifted and placed in position so that the connections can be made to the erected spine. In this stage, the stiffness of wings would not contribute to the overall stiffness and the weight of wings need to be resisted by the Spine itself.


fig 10Figure 10. Construction stage 4

 

  • Stage 5: Wings Activation

In this stage, the cantilever wings are now connected to the erected Spine with Stitch (Cast In-situ) and prestress is applied to the wings also. However, from the modeling point of view, the transverse prestressing will need to be done analyzed in Transverse models. The stiffness of the entire cross-section now resists the loads.

 

 

fig 11

Figure 11. Construction stage 5
 
 
  • Stage 6: Removing of Launching Girders

The Launching Girders are now removed and placed for the construction of the next span. In the model, the removal of loads takes place in this stage.

 

  • Stage 7: Activation of Superimposed Dead Loads and Crash Barrier Loads

The crash barrier and wearing course can now be placed on the span using elemental beam loads.

 

  • Stage 8: Long Term Effects

For studying the Long Term effects of the prestressing, the final stage is defined with a duration of about 10,000 days (or as per the user’s requirement).

 

The Moving Loads can now be defined with the required traffic lanes and vehicle definitions. The most critical load combinations can then be extracted and applied in the transverse models.


 

Transverse Modeling

 

The Transverse model is created by importing the section geometry into Midas and extruding the elements to create plate elements. For defining the prestress tendon profiles, dummy members (beam elements) are used across the section.

 

fig 12

Figure 12. Transverse model
 
 

For defining the moving loads, traffic surface lanes are used and the most critical output for Dead Loads and Live Loads combined in a particular section can be analyzed. Vehicle position is obtained from the longitudinal model and can be applied as pressure load or the complete span can also be modeled along with the moving load analysis.

 

 


4. Conclusion

 

The difference of output amongst the two methodologies can be observed from the deformation contours below:

 

fig 13

Figure 13. Deformation contour in transverse model

 

 

fig 14

Figure 14. Deformation contour in longitudinal model
 

 

It can be observed that in the transverse model, the deformation profile at various locations can be studied but in the longitudinal model, the entire cross-section behaves rigidly and deforms together. On the other hand, it is easier to perm design in the longitudinal models as compared to transverse models. Thus, the modeling depends on the requirements.

 

 


References

 

  1. Heggade, V N. (2021). CONSTRUCTION-CENTRIC SUSTAINABILITY OF PRECAST EGMENTAL BRIDGES CONSTRUCTED WITH SPAN-BY SPAN METHOD.
  2. Christopher D. White and John E. Breen. Evaluation Of The Composite Wing Girder Bridge At Bear Creek

 

Susbcribe
MIDAS Newsletter

Thank you, See you soon!
Share
About the Author
Dherya Saraswat | Technical Support Engineer | MIDAS IT R&D

Dherya is a Technical Support Engineer within MIDAS IT Research & Development center in India. He has 3+ years of experience in the design and analysis of various civil structures. He completed his Master's Degree in Structural Dynamics from IIT Roorkee. His major interests lies in non-linear dynamic analysis of civil structures particularly focusing on seismic analysis and design of structures.

Comments
DOWNLOAD Ebook Download

Please fill out the form below
to download the Ebook

All